Working with our partners to successfully undertake modular construction

Our team of engineers provided innovative and pragmatic design solutions, developing sound concepts to determine buildability of the required modules, including working through lifting methodologies and fixing points with contractors. The eight modules were built at a factory offsite with many of the first-fix services completed in an environment protected from weather before they were transported to the hospital and craned onto the roof.

Working in cooperation with a preselected crane supplier, the maximum weight of the module was established, and materials and design had to deliver a module within this limit.

Another challenge was the limited module height dictated by transportation restrictions to the site. This required close collaboration between our structural and services team to minimise the build height while providing the full range of required services.