Delivering an efficient, resilient, and sustainable energy network

Working alongside Elecnor Australia as Transgrid’s Engineering, Procurement and Construction (EPC) contractor, Aurecon is providing detailed design for EnergyConnect’s high voltage transmission towers, electrical lines, and substations. We’ve taken an integrated design, engineering and advisory approach to optimise the interconnector’s efficiency, resilience, and long-term sustainability.

Leveraging our experience delivering major transmission and grid connection projects, Aurecon reduced material use, lowered environmental impacts, and improved construction efficiency through design innovation – including the adoption of Australia’s first European-style Danubio towers.