Accelerating design despite restricted site access

Starting from the development of the initial reference design, Aurecon translated high level functional requirements to engineering requirements with limited site access. Given Port Wakefield is a Defence ‘Proof and Experimental Establishment’, there was restricted access to the site due to live weapons testing activities.

Aurecon undertook environmental, civil, geotechnical and unexploded ordnance investigations within a short access window that required planning from both Defence’s Guided Weapons Explosive Ordnance Group and Base stakeholders. Aurecon also utilised drone technology for topography surveys of the site due to limited ability to inspect the site.