Change your location to view content tailored for you.

Addressing challenges in pumped hydro design and delivery

Just as solar and wind energy decarbonise electricity supply, pumped hydro energy storage (PHES) is a mature technology that will be a core part of the energy mix in the transition to a net zero emissions future. It is critical as pumped hydro storage provides highly reliable, long-duration storage, that can help meet power generation demand and support an electricity system with high levels of renewable energy.

Clean energy storage technologies are an essential part of the future power system, and PHES has an important role to play, stabilising the grid and complementing the typically shorter duration storage provided by batteries.

The PHES resurgence in Australia brings different considerations to other locations globally, including prioritising biodiversity and First Nations matters before looking at design, engineering and delivery. Hear from Aurecon's experts as we dive deeper into the key considerations for delivering these complex projects.

Explore blogs & podcasts

What happens if our taps run dry?
Our blog – Just Imagine

What happens if our taps run dry?

Water infrastructure is a multibillion-dollar asset that, if we were currently to overhaul and redo, would likely drain an entire city budget.

Green Data Centres with SpaceDC
Our podcast – Engineering Reimagined

Ep.34 Green Data Centres with SpaceDC

Carolyn Harrington and Nick Stavroulakis from SpaceDC discuss the challenges in establishing much needed data centres in Asia, one of the world’s fastest growing markets.

The upside of downtime: using energy wisely
Our blog – Just Imagine

The upside of downtime: using energy wisely

Changing our behaviour to use energy in sync with its generation is just as reasonable a solution today as it was in pre-industrial times.

Collaboration for successful delivery

Delivering pumped hydro projects is multi-disciplinary and require specialists with expertise in water engineering, dams, power generation and power transmission, underground engineering, tunnelling, environment and planning, and more.

At Aurecon, we work together to bring the right experience and right expertise from across our business to these large, transformative projects.

Collaborative delivery models are particularly important for these projects due to their size, complexity, longer development times and often remote locations. Mitigating risks related to site location, access, underground works, resourcing and logistics needs planning from early stages of the design with all stakeholders and delivery partners. 

To find out more, get in touch with one of our team members below.

Get in touch with us to learn more

Or contact an office near you.
 Mohsen Moeini, Hydropower Leader – Australia.
Mohsen Moeini

Hydropower Leader – Australia

Paul Gleeson - Managing Director – Energy, Resources and Manufacturing
Paul Gleeson

Managing Director, Energy – Australia

Nick Quinn
Nick Quinn

Water Leader – Australia

We would love to work with you to bring your ideas to life, so get in touch and we'll get back to you.

Or contact an office near you.