Long Thanh International Airport, Vietnam
Aurecon provides engineering design services for the detailed design and construction phases of Vietnam's new aviation hub.
Change your location to view content tailored for you.
Located in the area of Cong Truong Me Linh roundabout in District 1 next to the new Vietcombank Tower, the Hilton Saigon Hotel enjoys a premium location in the heart of the Central Business District where most of the city's administrative offices, consulates and major commercial buildings are located.
Aurecon was appointed by Unity Investment Corporation to provide mechanical, electrical, plumbing, fire, structural and vertical transportation engineering design for the hotel which spans a total GFA of 53,800 square metres.
The hotel features 32 floors, 4 basements, 312 guest rooms, a ballroom with a capacity for 1,200 people, and other amenities including spa, fitness and retail.
Located in the heart of the Central Business District, Hilton Saigon Hotel features ballrooms, meeting rooms, and entertainment. Images courtesy of Unity Investment Corporation.
Located at the corner of a traffic-circle, Aurecon worked closely with other consultants to design an optimal solution to overcome various challenges posed by the small land footprint.
For instance, the tower required several complex transfers to accommodate ballrooms, meeting rooms and entertainment areas beneath the standard bay of the hotel’s structural frame. A deep basement solution was designed to meet constructability requirements, the intent of Hilton Hotels Worldwide, and architectural and interior design elements.

To improve energy efficiency and sustainability, the air-conditioning system was designed to recycle exhaust air from indoors to pre-cool outdoor air within the premise. Room control units were programmed to reduce ventilation rates for unoccupied rooms. The building’s heat pump is designed to take cold water from the chiller system to produce hot water, thus optimising the efficiency of the chiller system.
Hilton Saigon Hotel was completed in 2024.