The Sengkang and Punggol Light Rail Transit networks started operating in 2003 and 2005 respectively, providing connectivity for residents to the North-East MRT line. The Sengkang LRT Line is a 10.7 km light rail line with 14 stations while the Punggol LRT Line spans 10.3 km in length with 15 stations.

In 2015, as part of their regular asset inspection programme, the Singapore Land Transport Authority (LTA) identified areas that required improvement on both the Sengkang & Punggol LRT networks.

Aurecon was appointed to conduct a detailed structural analysis and to lead the inspection of the two light rail networks.

In addition to detailed physical inspections, the team investigated the root causes of the identified defects and proposed the most appropriate and cost-effective rectification measures.

Finally, Aurecon also prepared tender drawings and specifications for LTA to call for tender for the renewal of infrastructure works.

Location

Singapore

Client

Government of Singapore – Land Transport Authority

Aurecon's Role

Detailed engineering investigation and assessment

Complete

2019

square iconplus icon
Aurecon conducts inspections on Sengkang and Punggol light rail transit to propose the most appropriate and cost-effective rectification measures.
Aurecon conducts inspections on Sengkang and Punggol light rail transit to propose the most appropriate and cost-effective rectification measures.
Aurecon conducts inspections on Sengkang and Punggol light rail transit to propose the most appropriate and cost-effective rectification measures.
Aurecon conducts inspections on Sengkang and Punggol light rail transit to propose the most appropriate and cost-effective rectification measures.

We would love to work with you to bring your ideas to life, so get in touch and we'll get back to you.

Or contact an office near you.