Change your location to view content tailored for you.

The Lucinda Bulk Sugar Terminal (LBST) is located on the North Queensland coastline and services export of raw sugar from the Herbert region. Its 5.76 kilometre long jetty and offshore wharf suffered significant wave damage following Tropical Cyclone Yasi (TC Yasi) as it crossed the coastline in the early hours of Thursday 3 February 2011.

Aurecon was engaged by Queensland Sugar Limited (QSL) to provide a full suite of services to initially report on feasibility of repairs to the facility, and then to plan, design and manage the recovery project.

The repair and re-commissioning of LBST's offshore facilities was one of, if not the largest single recovery effort in the wake of the much publicised TC Yasi.

Fully operational on time and budget

The terminal was safely and successfully returned to full operations on time and on budget, to the satisfaction of all stakeholders, and subtly but importantly reconfigured in a way that it will be significantly more resilient in the face of the unlikely return of a similar event in the future.

Location

Gurambilburra Wulgurukaba and Bindal Country
Townsville, Queensland, Australia

Client

Queensland Sugar Ltd

Aurecon's Role

Full suite of services to initially report on feasibility of repairs to the facility, and then to plan, design and manage the recovery project

Complete

2013

square iconplus icon
Looking out over the water to the Lucinda Bulk Sugar Terminal.
New jetty roadway and conveyor gallery underpasses, Lucinda Bulk Sugar Terminal.
1 of 2
Looking out over the water to the Lucinda Bulk Sugar Terminal.
Looking out over the water to the Lucinda Bulk Sugar Terminal.
Looking out over the water to the Lucinda Bulk Sugar Terminal.

The successful delivery of the project is a demonstration of Aurecon’s capability and desire to work closely with our client, QSL, to respond quickly to a devastating event, to assemble a highly effective multi-disciplinary and multi-functional team, and to apply intellectual rigour and innovation in its design and project delivery to the betterment of all stakeholders.

The engineering for the project built on Aurecon's experience in delivery of innovative and durable industrial port projects – a history in which the terminal's original offshore facilities' design and construction more than 30 years ago formed an important part. Coupled with that expertise was the desire to maximise the opportunity to learn from the damage caused from this rare event.

Award-winning

The project has won the following awards:

We would love to work with you to bring your ideas to life, so get in touch and we'll get back to you.

Or contact an office near you.