The 33 level office tower at 363 George Street, Sydney, required spectacular architecture and highly skilled engineering to integrate five buildings, including two heritage sites, into the construction project.

Aurecon was engaged to provide structural, electrical, hydraulics and fire services engineering on the development.

Concrete and steel

The tower’s lowest level sits around 30 metres above George Street, supported by concrete-filled steel tubes that are completely unbraced by intermediate floors, forming a striking void.

Steel framing provided an unpropped construction platform at the first tower level. The expansive glass entry lobby required innovative structural engineering, with advanced analysis allowing Aurecon to minimise column size.

Location

Gadigal Country
Sydney, New South Wales, Australia

Aurecon's Role

Building design services including structural, electrical, hydraulics and fire engineering

Complete

2010

square iconplus icon
Exterior view of glass used in the 363 George Street main building.
The expansive glass entry lobby at 363 George Street.
363 George Street.
Interior view of 363 George Street.
Looking up from the street at the main building at 363 George Street.
1 of 5
Exterior view of glass used in the 363 George Street main building.
Exterior view of glass used in the 363 George Street main building.
Exterior view of glass used in the 363 George Street main building.

On the western face of the building, two central columns above the heritage building are supported by an inverted, V-shaped, steel column transfer, pumped with concrete and tied together by a large prestressed concrete tie formed inside a truss at the lowest tower floor, level eight.

Several other columns also underwent significant transfers above the roof of the building by inclining the columns and providing restraining props and ties at floor levels.

The use of high-strength concrete and advanced engineering analysis minimised the size of the core, providing increased lettable space. Lightweight cladding to the main vertical risers also created additional space and substantially reduced service coordination issues during construction.