A New Zealand first at Waitematā Station

One of the most challenging aspects of the project was constructing tunnels under Auckland’s 109-year-old former Chief Post Office at Waitematā Station. Aurecon led the detailed design and provided construction phase services for this critical part of the project. With the twin rail tunnels passing underneath the station, the 14,000-tonne building was underpinned to enable excavation of the tunnels.

A first for New Zealand, this monumental engineering feat took two years of planning. Often buildings are physically moved out of the way before underground construction takes place, however, that was not possible due to the heritage status of the CPO building.

Underpinning a building the size and weight of the CPO building was an extremely challenging feat. Over several weeks, the building was lifted 3-millimetres onto new foundation columns that were set 20-metres below the basement floor. Half of the building’s weight (7,000 tonnes) was transferred onto diaphragm walls. The operation was so carefully and precisely managed that it was barely perceptible to the public. This extensive and precise work was undertaken without causing any damage to the Category 1 heritage listed building and while also ensuring the station remained operational.