Kinangop Wind Park, Central Province, Kenya

Aurecon appointed as owner's engineer

A new wind farm in Kenya will add to Sub-Saharan Africa’s growing wind energy capacity, which is being driven by solid economic growth and an increasing population.

Aurecon was appointed as owner’s engineer by the project company, Kinangop Wind Park Ltd (KWP), for the construction phase of the 60.8 megawatt wind farm in Kenya’s Kinangop region.  This project has African Infrastructure Investment Managers (AIIM) as it’s the majority owner. The project has reached Financial Close and commissioning is expected to occur in mid-2015.

The wind farm will be built by Iberdrola Engineering, with General Electric to provide 38 1.6 megawatt wind turbines.

Kinangop is significant as the first major IPP wind farm in Kenya. The wind farm will generate enough renewable electricity to power the equivalent of 150,000 homes in the country.

Kenya is an exciting growth market for renewable energy with an attractive policy framework, which has enabled the progression of a number of wind and geothermal projects.

As owner’s engineer, Aurecon worked closely with the project partners to ensure that the wind farm was delivered on time, within budget and meets the expected level of reliability for long-term operation.