Eyre Peninsula, Australia

The 132 kilovolt transmission line connecting Lincoln and Whyalla in South Australia has recently been upgraded without any lost time safety incidents or interruption of supply, ahead of schedule and within budget.

The 270 kilometre long line connects Port Lincoln to the high voltage transmission network at Whyalla and has 620 towers with an average span of 440 metres.

Aurecon provided all concept design, detailed design and construction phase support services for the project.