Energy

Energy Projects

Project by market - Energy

Bethlehem Hydro Project

Aurecon was appointed to undertake the detailed design and project management duties for two mini hydro stations as part of the Bethlehem Hydro Project.

Markets: Water, Energy, Renewable energy, Power generation

Expertise: Environmental management, Programme & project management, Power generation, Dams

View full article ›

Bluewaters Power Station

The Griffin Group initiated the construction of Western Australia’s first privately owned and developed two unit sub critical coal fired power station near Collie, approximately 200 kilometres south of Perth in Western Australia.

Markets: Energy

Expertise: Ground engineering, Power generation

View full article ›

Burrinjuck Hydro Project

The Burrinjuck Hydro Project involved the construction of an additional 15MW hydro-electric power station and the refurbishment of an existing 10.8MW hydro power station at Burrinjuck Dam.

Markets: Energy, Renewable energy, Water, Construction

Expertise: Environmental management, Dams, Power generation, Programme & project management

View full article ›

Callide Oxyfuel Project

The world’s first clean coal project involves retrofitting the existing Callide A Power Station to enable oxy-fuel combustion and carbon dioxide capture.

Markets: Energy

Expertise: Power generation

View full article ›

Castle Hill Wind Farm

This project will see Aurecon assisting Genesis Energy to deliver strategically located and cost effective wind farms using sophisticated modelling technology.

Markets: Energy, Renewable energy

Expertise: Environmental management, Power generation, Ground engineering, Geospatial systems

View full article ›

Collgar Wind Farm

Aurecon is currently acting as owner’s engineer for the construction phase of Collgar Wind Farm in Western Australia.

Markets: Energy, Renewable energy, Power generation, Construction

Expertise: Power generation, Programme & project management, Environmental management, Sustainability

View full article ›

Eyre Peninsula

The 132 kilovolt transmission line was recently upgraded without lost time safety incidents or interruption of supply, ahead of schedule and within budget.

Markets: Energy, Transmission and distribution

Expertise: Power transmission & distribution

View full article ›

GECOL 220 kV Transmission Lines and Substation Projects

Aurecon was appointed in 2003 to provide services for electrical power supply construction projects in several locations in Libya, inclusive of an overhead transmission line in the Sahara desert.

Markets: Energy, Power generation, Transmission and distribution, Construction

Expertise: Power generation, Power transmission & distribution, Geospatial systems

View full article ›

Hobson Substation Grid Exit Point

To provide power supply security for Auckland’s CBD, national grid operator Transpower and local Auckland distribution utility Vector initiated the construction of two new substations.

Markets: Energy, Construction

Expertise: Power transmission & distribution, Tunnels

View full article ›

Huntly Power Station

The largest new power station to be built in New Zealand since 1999, the Huntly Power Station involved the construction of a 400 MW combined cycle gas turbine power plant, adjacent to the existing Huntly Power Station.

Markets: Energy, Construction, Power generation

Expertise: Power generation, Programme & project management

View full article ›

HVDC Pole 3 Upgrade

Transpower’s Pole 3 HVDC Upgrade required the construction of new convertor stations at the Benmore and Haywards electrical substations.

Markets: Energy

Expertise: Power transmission & distribution, Ground engineering, Building design

View full article ›

Kashimbila Dam and Hydropower Project

In order to meet the country’s power generation needs the Nigerian government embarked on a policy to increase its hydropower generation capacity.

Markets: Energy, Power generation, Renewable energy, Water

Expertise: Programme & project management, Dams, Ground engineering, Power generation

View full article ›

Future proofing Katherine’s electrical transmission and generation infrastructure

The Katherine Power Station provides vital power supply to the Katherine region in the Northern Territory. The power station is connected at the southernmost end of the Darwin to Katherine 132kV network and included the one critical 22kV switchboard that provided distribution supply to the entire Katherine community, with minimal redundancy.

Markets: Energy

Expertise: Power generation, Power transmission & distribution

View full article ›

Kogan Creek Solar Boost

CS Energy’s 750 megawatt coal-fired Kogan Creek Power Station in south-west Queensland will become home to a 44 megawatt solar thermal addition.

Markets: Energy, Renewable energy, Power generation

Expertise: Power generation, Programme & project management

View full article ›

Lake Bonney Wind Farm Stage 3

After the successful development of both the Lake Bonney Stage 1 (80.5MW) and Lake Bonney Stage 2 (159 MW) wind farm projects, Lake Bonney Wind Power, a subsidiary of Infigen energy, successfully commissioned the 39 MW Lake Bonney Stage 3 wind farm.

Markets: Power generation, Renewable energy, Energy, Construction

Expertise: Environmental management, Power generation, Sustainability

View full article ›

Mmamabula Energy Project

Aurecon is providing engineering design and project coordination services for the CIC Energy Corporation’s Mmamabula Energy Project.

Markets: Energy, Resources , Power generation, Construction

Expertise: Power generation

View full article ›

Nhon Trach 2

As one of the fastest growing economies in the world, Vietnam is rapidly planning and building power plants to meet both its current needs and to provide a sustainable infrastructure for future growth.

Markets: Energy, Power generation

Expertise: Power generation

View full article ›

Royalla solar photovoltaic plant

Solar development company FRV Services Australia has completed construction of its Royalla 20MW solar photovoltaic (PV) project located in the Australian Capital Territory (ACT).

Markets: Energy

Expertise: Power generation, Programme & project management

View full article ›

Stortemelk Hydropower Project

The Stortemelk hydropower project is the implementation of one of the three projects included in the Botterkloof and Merino II feasibility study by Aurecon for Stortemelk Hydro (Pty) Ltd, with NuPlanet as the project developers.

Markets: Energy

Expertise: Power generation

View full article ›

Woodlawn Wind Farm

The Woodlawn Wind Farm is located in the Capital Renewable Energy Precinct, 70 km north of Canberra.

Markets: Energy, Renewable energy

Expertise: Programme & project management

View full article ›

Biomass Project

Aurecon was retained by Western Australia Biomass Pty Ltd to facilitate the planning and environmental approval process for a proposed biomass power generation plant in Diamond Mill, Western Australia.

Markets: Renewable energy, Energy, Government

Expertise: Environmental management, Power generation

View full article ›

Millennium Arts Project

Aurecon, in association with Bovis Lend Lease (BLL), provided design, documentation and construction phase services for three of the four components of the Millennium Arts Project.

Markets: Property, Government, Construction, Energy

Expertise: Programme & project management, Environmental management

View full article ›

Pelican Point Facility

Aurecon has completed detailed design of Caltex’s biggest fuel terminal in South Australia. Owned and operated by Terminals Pty Ltd, the 85 million litre Pelican Point facility represents a 50 per cent increase in South Australia’s storage.

Markets: Energy

View full article ›

Brisbane City Hall Restoration

Aurecon restores and extends the life of Brisbane City Hall for another 80 years by using 21st century tools and technology.

Markets: Property, Construction, Energy

Expertise: Building design, Sustainability

View full article ›

Maguga Dam on the Komati River

The Lomati and Komati Rivers in the eastern lowveld of the southern African region fall under the Komati Basin Water Authority, a bi-national agency created by South Africa and Swaziland to regulate the supply of water to the adjacent communities and extensive agricultural lands of both countries. Maguga Dam is the largest component in the system, located in a mountainous area 12 km south of Piggs Peak on the Komati River.

Markets: Water, Energy, Renewable energy

Expertise: Environmental management, Programme & project management, Dams, Water resources management

View full article ›

Mokolo Crocodile Water Augmentation Project

The Mokolo and Crocodile Water Augmentation Project (MCWAP) entails the phased construction of two main bulk raw water transfer systems, as well as associated infrastructure to meet the new power station, mines, and domestic demands.

Markets: Water, Energy, Government, Construction

Expertise: Dams, Programme & project management, Water resources management, Bulk water conveyance

View full article ›

Nam Theun 2 Hydroelectric Project

Aurecon was engaged to undertake tender, preliminary and detailed design and documentation of the downstream channel works for the Nam Theun II Hydropower Project. 

Markets: Energy, Water, Power generation, Renewable energy, Government

Expertise: Environmental management, Water & wastewater treatment, Ground engineering, Tunnels

View full article ›