Construction

Construction Projects

Project by market - Construction

Stamford Residences

Innovative engineering by Aurecon enabled to additional floors to be constructed above the world-renowned Stamford Plaza Hotel in Auckland.

Markets: Construction, Built Environment

Expertise: Ground engineering

View full article ›

TrackStar Alliance

Established in 2006, the TrackStar Alliance, which Aureon is a part of, has designed and constructed a series of rail infrastructure projects in South East Queensland.

Markets: Construction, Transport, Urban transport

Expertise: Rail & rail systems

View full article ›

Australian Square Kilometre Array Pathfinder (ASKAP) Project

Aurecon was awarded the role of infrastructure designer and construction contract superintendent for part of the AUD 152 million project, in collaboration with various government stakeholders.

Markets: Data & Telecommunications, Built Environment, Construction

Expertise: Environmental management, Data & ICT facilities, Geospatial systems

View full article ›

Burrinjuck Hydro Project

The Burrinjuck Hydro Project involved the construction of an additional 15MW hydro-electric power station and the refurbishment of an existing 10.8MW hydro power station at Burrinjuck Dam.

Markets: Energy, Renewable energy, Water, Construction

Expertise: Environmental management, Dams, Power generation, Programme & project management

View full article ›

Collgar Wind Farm

Aurecon is currently acting as owner’s engineer for the construction phase of Collgar Wind Farm in Western Australia.

Markets: Energy, Renewable energy, Power generation, Construction

Expertise: Power generation, Programme & project management, Environmental management, Sustainability

View full article ›

GECOL 220 kV Transmission Lines and Substation Projects

Aurecon was appointed in 2003 to provide services for electrical power supply construction projects in several locations in Libya, inclusive of an overhead transmission line in the Sahara desert.

Markets: Energy, Power generation, Transmission and distribution, Construction

Expertise: Power generation, Power transmission & distribution, Geospatial systems

View full article ›

Hobson Substation Grid Exit Point

To provide power supply security for Auckland’s CBD, national grid operator Transpower and local Auckland distribution utility Vector initiated the construction of two new substations.

Markets: Energy, Construction

Expertise: Power transmission & distribution, Tunnels

View full article ›

Huntly Power Station

The largest new power station to be built in New Zealand since 1999, the Huntly Power Station involved the construction of a 400 MW combined cycle gas turbine power plant, adjacent to the existing Huntly Power Station.

Markets: Energy, Construction, Power generation

Expertise: Power generation, Programme & project management

View full article ›

Lake Bonney Wind Farm Stage 3

After the successful development of both the Lake Bonney Stage 1 (80.5MW) and Lake Bonney Stage 2 (159 MW) wind farm projects, Lake Bonney Wind Power, a subsidiary of Infigen energy, successfully commissioned the 39 MW Lake Bonney Stage 3 wind farm.

Markets: Power generation, Renewable energy, Energy, Construction

Expertise: Environmental management, Power generation, Sustainability

View full article ›

Mmamabula Energy Project

Aurecon is providing engineering design and project coordination services for the CIC Energy Corporation’s Mmamabula Energy Project.

Markets: Energy, Resources , Power generation, Construction

Expertise: Power generation

View full article ›

ACT Bushfire Abatement Project

Aurecon has been working closely with ACT Parks Conservation and Lands (PCL) / ACT Procurement Solutions since 2008 providing design, documentation, planning approval and construction management for fire management related requirements.

Markets: Government, Construction

Expertise: Programme & project management, Environmental management

View full article ›

Ferndale Sustainable Community

Ferndale Trust had a vision to create a unique lifestyle development for the Kapiti District encompassing best practice environmental design and sustainable land development.

Markets: Residential, Government, Construction

Expertise: Environmental management, Water & wastewater treatment

View full article ›

Kelvin Grove Urban Development

Kelvin Grove Urban Village is Australia's first master planned, mixed-use development, combining education, residential, business, cultural, and leisure activities within an inner-city environment.

Markets: Residential, Government, Construction

Expertise: Environmental management, Urbanisation, Sustainability, Precincts & estates, Building design, Integrated planning, Infrastructure advisory

View full article ›

Millennium Arts Project

Aurecon, in association with Bovis Lend Lease (BLL), provided design, documentation and construction phase services for three of the four components of the Millennium Arts Project.

Markets: Built Environment, Government, Construction, Energy

Expertise: Programme & project management, Environmental management

View full article ›

Nova Vida

The Nova Vida Housing Development is the largest building project ever undertaken in Luanda, Angola. Phase 1 provided housing for 30,000 people on a site area of approximately 440 ha.

Markets: Residential, Government, Construction

Expertise: Environmental management, Urbanisation, Precincts & estates, Building design

View full article ›

Ultra-thin Reinforced Concrete Project

The Gauteng Department of Public Transport, Roads and Works (GDPTRW), in partnership with the City of Tshwane, and Council for Science and Industrial Research, initiated the Ultra-thin Reinforced Concrete Pavement (UTRCP) project to address the growing demand for street resurfacing in a number of previously disadvantaged townships.

Markets: Transport, Government, Construction

Expertise: Environmental management, Roads & highways

View full article ›

University of South Africa

The first phase of construction at the University of South Africa’s (UNISA) Muckleneuk campus began in the early 1970s, while the Sunnyside campus was obtained in the 1980s.

Markets: Construction, Government, Built Environment

Expertise: Environmental management

View full article ›

Awatoto One Side Upgrade

Aurecon was appointed to upgrade the superphosphate manufacturing plant at Awatoto, Napier.

Markets: Built Environment, Manufacturing, Construction

Expertise: Programme & project management, Manufacturing

View full article ›

Costco Docklands

Aurecon acted as local engineer for the first Costco store built in Australia, as they required its US-based design to be certified to Australian Standards.

Markets: Manufacturing, Built Environment, Light Industrial, Construction

View full article ›

Hautapu Lactose Evaporator

Aurecon designed and installed a technically innovative finisher evaporator and lactose concentrate load-in facilities to achieve the project objectives.

Markets: Manufacturing, Construction

Expertise: Manufacturing, Programme & project management

View full article ›

Winstone Pulp International Refiner Heat Recovery

Aurecon provided detailed engineering design work and managed the installation of the heat recovery system for our client, Energy for Industry (EFI), at the Winstone Pulp International (WPI) Karioi Pulp Mill site.

Markets: Manufacturing, Construction

Expertise: Manufacturing, Environmental management, Programme & project management

View full article ›

Adelaide Convention Centre Redevelopment – West Building

The innovative engineering solutions that Aurecon used on the Adelaide Convention Centre Redevelopment – West Building allowed us to create the imaginative superstructures, hybrid structural solutions and major clear span roof and floor structures within a very short time frame, tight budget and amongst significant site restrictions.

Markets: Built Environment, Construction

Expertise: Building design

View full article ›

175 Eagle Street

Aurecon was appointed for the refurbishment and upgrading of 175 Eagle Street, a 21 000 m² riverfront high-rise office building comprising 19 storeys.

Markets: Built Environment, Construction, Commercial office buildings

Expertise: Building design

View full article ›

480 Queen Street

Aurecon provided structural and civil engineering services for 480 Queen Street - a 34-storey Premium Grade office building located in Brisbane CBD’s golden triangle.

Markets: Built Environment, Commercial office buildings, Construction

Expertise: Building design

View full article ›

5 Martin Place

5 Martin Place has again been transformed. Innovative thinking was key to creating an iconic landmark that has stayed true to its heritage.

Markets: Built Environment, Commercial office buildings, Construction

Expertise: Building design, Tall buildings

View full article ›

ABSA Towers North

Although Johannesburg's CBD isn’t a conventional location for environmentally friendly design, the towers demonstrate an exemplary commitment to sustainability through the resources which were conserved during the design, construction and operation phases.

Markets: Commercial office buildings, Construction, Built Environment

Expertise: Environmental management

View full article ›

Adelaide Convention Centre - Plenary Redevelopment

The Adelaide Convention Centre Redevelopment project is an AUD400 million project that includes a major extension to the existing facilities as well as the construction of a new plenary facility. Innovative solutions were used to build the new Plenary Building on top of the existing car park. The design team has created a new, state-of-the-art facility in a manner that didn’t require putting a single new pile on the challenging project site.

Markets: Construction, Built Environment

Expertise: Building design

View full article ›

Brisbane City Hall Restoration

Aurecon restores and extends the life of Brisbane City Hall for another 80 years by using 21st century tools and technology.

Markets: Built Environment, Construction, Energy

Expertise: Building design, Sustainability

View full article ›

Coca Cola Plant

When Namibia Beverages urgently required additional production area, a new syrup room, crown store, HP compressor room and a transformer facility as well as an enlargement of their existing warehouse area to keep up with demand for their products, Aurecon was an obvious choice for the design of a 3350m2 steel structure.

Markets: Built Environment, Light Industrial, Construction

Expertise: Manufacturing

View full article ›

Coca Cola Production Facility

The new Coca-Cola production facility in Gotche Street, Bloemfontein, was designed to replace the existing, outdated facility in order to accommodate the growing demand for Coca-Cola products throughout South Africa.

Markets: Built Environment, Light Industrial, Construction

Expertise: Water & wastewater treatment

View full article ›

Leopard Creek Golf Estate

The development of Leopard Creek Golf Estate in Malelane, South Africa, involved a full spectrum of civil, electrical, electronic and structural engineering design, including geotechnical investigations.

Markets: Built Environment, Sports & leisure, Construction

View full article ›

Madinat Jumeirah Resort

Aurecon provided building services for the internationally acclaimed Madinat Jumeirah Resort in Dubai.

Markets: Built Environment, Sports & leisure, Construction

Expertise: Hotels, resorts & casinos, Building design

View full article ›

Moorebank Units Relocation (MUR) Project

Aurecon provided design services for the Australian Defence Force Moorebank Units Relocation (MUR) Project, the first of its kind to achieve a clash-free model during the design phase.

Markets: Built Environment, Building information modelling (BIM) for Built Environment, Construction, Defence

Expertise: Building design, Precincts & estates

View full article ›

Sonangol Head Office

Aurecon provided structural design, as well as construction supervision for the 24-storey Sonangol Head Office building in Luanda, Angola. The design overcame a number of structural challenges, including the height of the building and the addition of an extra floor to the post-tensioned floor system.

Markets: Built Environment, Commercial office buildings, Construction

View full article ›

St. Regis Saadiyat Island Resort

Being developed by Abu Dhabi’s Tourism Development & Investment Company (TDIC), who are in the process of transforming the island into a signature tourist, leisure, residential and cultural destination, the St. Regis Saadiyat Island resort and precinct forms part of a masterplan which will eventually see the island become home to the famed Guggenheim and Louvre museums.

Markets: Construction, Built Environment, Sports & leisure

Expertise: Ground engineering, Water resources management, Hotels, resorts & casinos, Building design

View full article ›

Tait Communications, Christchurch

Aurecon delivers high-level earthquake protection to the new global headquarters for Tait Communications in Christchurch, New Zealand.

Markets: Built Environment, Commercial office buildings, Construction

Expertise: Building design, Sustainability

View full article ›

The Malt Store

Aurecon was contracted by Grocon to rejuvenate the iconic Carlton & United Brewery Malt Store building by repurposing it into modern retail and office space.

Markets: Built Environment, Commercial office buildings, Construction

Expertise: Building design, Tall buildings

View full article ›

The Peter Mokaba Sporting Complex

South Africa played host to the 2010 FIFA World Cup™. This was the first time this premier sporting event on the international calendar had been held on the African continent.

Markets: Built Environment, Sports & leisure, Construction

Expertise: Sports & entertainment

View full article ›

Zevenwacht Mall

Aurecon completed the structural engineering design for Zevenwacht Mall in Kuilsrivier, Western Cape.

Markets: Built Environment, Residential, Construction

View full article ›

Abbot Point Coal Terminal

Since 2005, Aurecon Hatch has provided engineering, procurement and construction management (EPCM) services for three expansions of the terminal to 50 Mtpa and is also studying an ultimate expansion to 230 Mtpa.

Markets: Resources , Construction

Expertise: Bulk transport, Ports & terminals

View full article ›

ASA Chrome Beneficiation Plant

Aurecon formed part of a joint venture to deliver the ASA Chrome Beneficiation Plant through a modified engineering, procurement and construction project.

Markets: Manufacturing, Construction

Expertise: Programme & project management, Manufacturing

View full article ›

Jilalan Rail Yard Upgrade

Queensland Rail (QR) National’s Jilalan Rail Yard is located three kilometres south of Sarina and provides maintenance and service to the trains that haul coal on the Goonyella coal supply chain.

Markets: Resources , Transport, Construction, Government

Expertise: Rail & rail systems, Bulk transport

View full article ›

Cunene River Bridge

The new Cunene Bridge is currently the longest bridge in Angola, and lies on the major arterial road linking the main cities of Lubango and Ondjiva in south-western Angola.

Markets: Transport, Construction, Government

Expertise: Bridges & civil structures

View full article ›

Johnsonville Tunnel clearance assessment

The new Matangi passenger trains for the Wellington network meant there was a need to upgrade the Johnsonville Railway. Aurecon was to model the dynamic performance of the proposed Matangi trains through the tight and winding route to achieve the minimal tunnel upgrade works.

Markets: Construction, Transport, Urban transport

Expertise: Rail & rail systems, Tunnels, Geospatial systems

View full article ›

Meydan Racecourse Development

The Dubai Roads and Transport Authority appointed Aurecon for the design, tender documentation and construction supervision for the required road network and bridges.

Markets: Transport, Urban transport, Government, Construction

Expertise: Programme & project management, Roads & highways

View full article ›

Mirdiff Interchange

Aurecon was appointed to undertake the design and construction supervision of an improved interchange for the residential areas of Mirdiff, Al Muhaisanah and Al Mezhar to the southeast of the Dubai city centre.

Markets: Transport, Urban transport, Construction, Government

Expertise: Programme & project management, Roads & highways

View full article ›

Mohlapiso Bridge over the Senqu River

This project was undertaken to provide all-weather access for the communities living north of the Senqu River in the Qacha's Nek district in Lesotho.

Markets: Transport, Rural transport, Construction, Government

Expertise: Programme & project management

View full article ›

MRTA Purple Line

Aurecon worked closely with the MRTA and Italian-Thai Development to oversee the design, planning and construction of Bangkok's MRT Purple Line.

Markets: Construction, Transport, Urban transport

Expertise: Infrastructure design, Rail & rail systems

View full article ›

Northern Busway Auckland

Aurecon was New Zealand Transport Agency’s North Sector consultant for the design and construction monitoring of this capital works project linking North Shore City with Auckland’s CBD.

Markets: Transport, Urban transport, Construction, Government

Expertise: Roads & highways

View full article ›

Rehabilitation of the road between Namibe and Lubango

The Angolan Government’s ‘Five Roads Project’ was established to improve select National Roads to a maintainable standard. Aurecon was appointed to provide detailed design and tender documentation, construction supervision and contract management.

Markets: Transport, Rural transport, Construction, Government

Expertise: Roads & highways, Programme & project management

View full article ›

Singida-Katesh Road Upgrade

Aurecon provided supervision services for the Singida-Katesh road upgrade, which covered 65 km of the road link between the northern zone and the central corridor (Dodoma).

Markets: Transport, Rural transport, Government, Construction

Expertise: Roads & highways

View full article ›

The Central Terminal Building at OR Tambo International Airport

Aurecon was involved in the development of the Central Terminal Building at OR Tambo International Airport, the project included the implementation of a complex glass and aluminium facade system, pivotal to the CTB's visual appeal.

Markets: Transport, Airports, Built Environment, Construction, Government

Expertise: Airports, Building design

View full article ›

Windsor Flood Evacuation Route

Aurecon became involved in the Roads and Traffic Authority of NSW initiated development of a new flood evacuation route for the town of Windsor in Sydney’s north-west.

Markets: Transport, Water, Construction

Expertise: Environmental management, Ground engineering, Programme & project management, Roads & highways, Infrastructure design

View full article ›

Luggage Point Advanced Water Treatment Plant

The AWTP forms part of the Western Corridor Recycled Water Project (WCRW), the largest recycled water scheme in the southern hemisphere.

Markets: Water, Construction, Government

Expertise: Environmental management, Water & wastewater treatment, Programme & project management

View full article ›

Mokolo Crocodile Water Augmentation Project

The Mokolo and Crocodile Water Augmentation Project (MCWAP) entails the phased construction of two main bulk raw water transfer systems, as well as associated infrastructure to meet the new power station, mines, and domestic demands.

Markets: Water, Energy, Government, Construction

Expertise: Dams, Programme & project management, Water resources management, Bulk water conveyance

View full article ›

Sunderland Wastewater Treatment Works

The Sunderland Ridge Wastewater Treatment Works (WWTW) is located 15 km west of the Centurion Central Business District.

Markets: Water, Government, Construction

Expertise: Water & wastewater treatment, Programme & project management

View full article ›

Vlakfontein Canal Upgrade

The Vlakfontein canal transports raw water being pumped from Grootdraai Dam at Standerton, Mpumalanga over a 37 km long distance to the Grootfontein Pump Station.

Markets: Water, Government, Construction

Expertise: Programme & project management, Dams, Water resources management, Bulk water conveyance

View full article ›

Wadi Wishka Dam

The Wadi Wishka Dam project, some 650km southeast of Tripoli, was successfully completed after just over two years of construction in the Libyan Desert.

Markets: Water, Construction, Government

Expertise: Dams, Ground engineering

View full article ›
To top