Borumba Dam flood remediationBorumba Dam flood remediation

Aurecon was initially engaged by Seqwater to undertake an assessment of the flood damage that occurred at Borumba Dam during January 2011. More information >

Markets: WaterGovernment Expertise: DamsGround engineering  

Acceptable Flood Capacity (AFC) safety upgrade of the Moogerah Dam, AustraliaAcceptable Flood Capacity (AFC) safety upgrade of the Moogerah Dam, Australia

Aurecon was engaged by Seqwater to conduct an investigation into an Acceptable Flood Capacity (AFC) safety upgrade of Moogerah Dam, which is located near Boonah, south-west of Brisbane. More information >

Markets: WaterGovernment Expertise: DamsGround engineering  

The South Island Line (East) (SIL(E)) is a 7 km medium capacity railway extension connecting the Southern District of Hong Kong to the existing MTR network at Admiralty Station (ADM). More information >

Markets: Transport Expertise: Mass transitGround engineeringTunnels  

Auckland City Rail Link, New Zealand

Auckland’s expanding population and limitations on its existing transport system require a high-capacity, high-quality transport network to match increasing demand. More information >

Markets: Transport Expertise: Rail and rail systemsGround engineeringGeospatial systemsInfrastructure design  

SH18 Hobsonville Motorway and SH16 Brigham Creek Extension, New ZealandSH18 Hobsonville Motorway and SH16 Brigham Creek Extension, New Zealand

The project entailed six kilometres of new four-lane motorway (SH18), a three kilometre, four-lane extension of the SH16 motorway, four major interchanges and seven bridge structures. More information >

Markets: TransportConstruction Expertise: Ground engineeringRoads and highways  

Bluewaters Power Station, AustraliaBluewaters Power Station, Australia

The Griffin Group initiated the construction of Western Australia’s first privately owned and developed two unit sub critical coal fired power station near Collie, approximately 200 kilometres south of Perth in Western Australia. More information >

Markets: Energy Expertise: Ground engineeringPower generation  

NZ Inter Island High Voltage Direct Current HVDC Pole 3

Transpower’s Pole 3 HVDC Upgrade required the construction of new convertor stations at the Benmore and Haywards electrical substations. More information >

Markets: Energy Expertise: Power transmission and distributionGround engineeringBuilding design  

Aurecon was engaged by RLS-JV to undertake the role of Design Verification Engineer (DVE) to check, verify and certify the design of project works for the Doha Metro Red South Line Underground. More information >

Markets: TransportUrban transport Expertise: Rail and rail systemsGround engineeringTunnels  

Hanoi International Airport Terminal 2Hanoi International Airport Terminal 2

Aurecon was engaged to provide the structural and geotechnical engineering for Terminal 2. More information >

Markets: PropertyTransportAirports Expertise: Ground engineeringAirportsBuilding design  

A photo of Alkimos Quinns Main Sewer

To accommodate for the expansion of Perth’s northern suburbs, the Water Corporation of Western Australia initiated the construction of a new wastewater treatment plant (WWTP). More information >

Markets: Water Expertise: Water and wastewater treatmentGround engineeringTunnels