Aurecon’s Christchurch Building Services Team were tasked with the challenge of working in a live campus environment whilst demolishing and building $80m of state of the art teaching space for client, Rangi Ruru Girls’ School. More information >

Markets: Property Expertise: Building servicesBuilding sciences  

Wickham aerial - Photo courtesy of Rio Tinto 1

The project started in July 2011 and involved the demolition of existing accommodation, the subdivision of residential lots and the construction of new accommodation, central facilities buildings, residential dwellings, as well as associated infrastructure upgrades. More information >

Markets: Resources  Expertise: Mine services  

Ban Phuc Nickel Mine process plant

Asian Mineral Resources Limited (AMR) is developing the Ban Phuc Nickel Mine Project – an underground mine using modern mechanised equipment that will feed a process plant incorporating conventional sulphide flotation technology for the production of a Ni-Cu rich concentrate. More information >

Markets: Resources  Expertise: Mine services  

BHP Olympic Dam

Aurecon was engaged to undertake a validation of the costs, programme, and risks associated with preparation for a pre-mine excavation at a large mining/processing operation in South Australia’s far north. More information >

Markets: Resources  Expertise: Mine services  

Aurecon was appointed by steelwork contractor, Alfasi, to provide design engineering services for the long-span curved steel roof of the terminus building – which is approximately 180m long and 30m high with an elegant freeform curved profile. More information >

Markets: PropertyTransport Expertise: Building structuresMass Transit  

The South Island Line (East) (SIL(E)) is a 7 km medium capacity railway extension connecting the Southern District of Hong Kong to the existing MTR network at Admiralty Station (ADM). More information >

Markets: Transport Expertise: Mass TransitGround engineering  

Water Proofing the West Stage One, AustraliaWater Proofing the West Stage One, Australia

The project involves the creation of the first stage of a region wide system that harvests, treats and stores stormwater and distributes non-potable water through western Adelaide. More information >

Markets: WaterGovernment Expertise: Water resources managementInfrastructure advisory  

Cable tunnel requiring protectiondecon 1

Aurecon was appointed lead consultant in August 2012 to provide technical and project management services after winning a market tender to deconstruct Spark’s (formerly Telecom) 91 Hereford Street building. More information >

Markets: Data & telecommunicationsProperty Expertise: Building structuresBuilding sciencesProgramme and project management  

Aurecon was appointed by the Commonwealth of Australia; Department of Defence to develop a solution to combat the challenges of an ageing Defence Estate, unsustainable construction and related uncertainty over the estate’s ability to support current and future capability. More information >

Markets: Defence Expertise: Asset management