Projects 

 

Aurecon was appointed by steelwork contractor, Alfasi, to provide design engineering services for the long-span curved steel roof of the terminus building – which is approximately 180m long and 30m high with an elegant freeform curved profile. More information >

Markets: Built EnvironmentTransport Expertise: Mass transitBuilding design  

Kinangkop Windfarm

Aurecon was appointed as owner’s engineer for the construction phase of the 60.8 megawatt wind farm in Kenya’s Kinangop region. More information >

Markets: Energy Expertise: Power generationSustainability  

KwaNovuka rural water supply project, Natal

Aurecon was appointed by for the design and site supervision of the KwaNovuka rural water supply project. More information >

Markets: Water Expertise: Water resources management  

Forsyth Barr Stadium

Forsyth Barr Stadium in Dunedin, New Zealand, is the world’s only permanently covered stadium with a natural turf playing field. More information >

Markets: Built EnvironmentSports and leisure Expertise: Sports and entertainment  

Ark Coca Cola Place - view from Level 19Ark Coca Cola Place - Exterior

Ark-Coca-Cola Place (aka Coca-Cola Place) is a landmark A-grade office building in North Sydney comprising 28 500 m² over 21 floors. More information >

Markets: Built EnvironmentCommercial office buildings  

Nile Basin Initiative

Funded by the World Bank, The Nile Basin Initiative (NBI) was founded with the goal of developing the river Nile in a cooperative manner in order to ensure its resources are shared and that its substantial socio-economic benefits promote regional peace and security. More information >

Markets: Water Expertise: Water resources management  

Granger Bay Boulevard and Green Point Roundabout Traffic Circle - circle planter on deckGranger Bay Boulevard and Green Point Roundabout Traffic Circle

Aurecon was appointed by the City of Cape Town for the design and construction supervision of the Granger Bay Boulevard and Green Point Traffic Circle which now provide effective access for vehicles and pedestrians to the Green Point Stadium and the Victoria and Alfred Waterfront. More information >

Markets: TransportUrban transport Expertise: Roads and highways  

Joint Maputo River Basin Water Resources Study: Economic development principlesJoint Maputo River Basin Water Resources Study: Economic development principles

The findings of this study saw the Aurecon-led JV team recommend key principles for the development of sound management approaches for the basin. More information >

Markets: WaterGovernment Expertise: Water resources managementDams  

Algoa Reconciliation StudyAlgoa Reconciliation Study

Aurecon was appointed by the DWA to undertake the Algoa Reconciliation Study in the Nelson Mandela Bay Municipality (NMBM) and the Coega Industrial Development Zone. More information >

Markets: WaterGovernment Expertise: Environmental managementWater resources management  

Haughton River Integrated Catchment Management PlanHaughton River Integrated Catchment Management Plan

The Haughton River Integrated Catchment Management Plan was a consultative project to develop strategies to improve management of the land and water in the Haughton River catchment between Ayr and Townsville in North Queensland. More information >

Markets: WaterGovernment Expertise: Water resources managementEnvironmental management